Sky_1.jpg
 

INNOVATION AWAITS AT GENESIS

Genesis - Marina is a ±560,000 SF world class, Class A project offering laboratory and office. It is one of Phase 3 Real Estate Partners, Inc. (P3RE) latest new constructions in the Bay Area, providing a wide range of features and amenities that are essential for success in the life science industry. Within this multi-tenant ecosystem, the project offers a variety of suite size ranges from ±14k to ±42K. The GENESIS spec program is first of its kind for a purpose built, new construction development. It is designed from the ground up with robust infrastructures and systems, flexible laboratory designs and a range of support services to help companies grow.

Located at Sierra Point, GENESIS Marina maximizes exposure to the captive audience along Highway 101’s view corridor, while conveniently bypassing the congestion of nearby Oyster Point. GENESIS Marina will connect the regions scientific community with some of the most modern and cutting edge facilities designed to date. Tour the project today to learn more.

New Spec Suites | Available Now

 


icon.png

NEW CONSTRUCTION

±560,000 RSF Full Spec Campus

Suites Range from ±14,000 to ±42,000 RSF

Robust Laboratory Infrastructure

On-Site Facility Teams

icon2.png

FULLY AMENITIZED

Multi-Kitchen Marketplace

State-of-the-art Fitness Center

Direct Bay Trail Access

2 Level Parking Garage

icon3.png

PREMIER SPEC SUITES

Move-In-Ready Spec Suites

TRUE Gold Certification

Flexable Lab Environments

15-18 Foot Deck Clearances

 

 
 
 

Click the thumbnail images below to view larger.

 
 

 

GenesisMarina-034.jpg
 

Experience the Difference

Access Bay Area – And Investors – With Ease

Genesis is located right off Highway 101 in Brisbane. This iconic locale provides premier visibility and convenient access throughout the Bay Area whether your destination is a key financing meeting or dinner downtown.

VOTED BEST SITES FOR COMMUTERS 2024

 
 
 
 

Icon_2_.png

San Francisco Airport

10 Minutes

Icon_2_2.png

Downtown
San Francisco

13 Minutes

Icon_2_3.png

Silicon Valley

25 Minutes

Icon_2_5a.png

East Bay

25 Minutes


_N4A4010-Edit.jpg

 

FIVE COMPONENTS - endless options

Every GENESIS suite is equipped with an industry standard, modular benching system. This system minimizes downtime and maximizes flexibility. The 5-component system is pre-plumbed and pre-wired for fast installation and effortless reconfiguration. Add components and rearrange overnight.

 

 
 
Icon_3_.png

Adjustable Height Work Surfaces


Adaptable to almost any work
environment and constructed with a welded metal frame to provide stability to the most
sensitive instruments.

Icon_3_2.png

Mobile
Cabinets


Combine any number of
cabinets to customize storage.


Icon_3_3.png

Adjustable Shelving Unit


Bolts to any adjustable height table to offer 2 or 3 levels of shelving. Half-length units also available.

Icon_3_4.png

Service Unit


The core component, designed to accommodate up to 7 lab gasses and 12 electrical circuits per unit.

Icon_3_5.png

Fume Hoods


Each suite is capable of accommodating various sized fume hoods ranging from 4 to 8 feet.

 

Click the thumbnail images below to view larger.

 
 
_N4A1387_LuminarNeo-edit-Edit.jpg

For Leasing and Project Information


 

BEN PAUL
Cushman & Wakefield
Vice Chairman
+1 650.401.2123
ben.paul@cushwake.com
LIC #01210872

MARC POPE
Cushman & Wakefield
Vice Chairman
+1 650.401.2131
marc.pope@cushwake.com
LIC #01474483

MIKE MORAN
CBRE
Vice Chairman
+1 650.245.2446
mike.moran@cbre.com
LIC #00901003

BECKA STUDER
Phase3 Real Estate Partners
Senior Director, Leasing and Marketing
+1 951.663.2997
studer@p3re.com
LIC #02004534